4.7. Diversion of rivers and other temporary dam construction works

• Upstream dam

• Duct inlet diversion

• Diversion duct
(σήραγγα ή επιφανειακός)

• Duct outlet diversion

• Downstream barrier

Εκτροπή ποταμού για κατασκευή φράγματος. Σήραγγες εκτροπής, πρόφραγμα κτλ.

River diversion

The following video shows the opening of the embankment to the entrance of the diversion tunnel and the simultaneous construction of the upstream dam to stop the normal flow of the river.

Diversion Pipes

Surface pipes in the foundation of the dam
• Small pipes (D <2.50 m), steel or concrete
• Small benefits
• Low construction costs

Diversion Tunnels

Underground diversion ducts (tunnels) in dam support. Usually large diameter pipes (D = 3-12 m) for diversion of large flows. High construction costs

Pipeline designs for free surface flow and pressure flow

Rectangular cross-section of inlet for installation of blocking gates • Background for distribution of loads of block beams (cases of large opening

Spillways

  • Open type located on the dam
  • Open type at reservoir slopes
  • Tunnel type with intake at the reservoir slope